1. Ammonia gas is lighter than air, and the installation height of the ammonia detection probe should be 0.5-2m higher than the release source.
2. The detection probe should be installed in a place without shock, vibration, and strong electromagnetic field interference, and a clearance of not less than 0.3m should be left around.
3. The installation and wiring of the detection probe shall be carried out according to the requirements specified by the manufacturer, and shall comply with the relevant regulations on the installation and wiring of explosion-proof instruments [1].